Restructuration du Théâtre Louis Aragon

  • Year 2022
  • Localisation Tremblay-en-France (93)
  • Programme Restructuration et extension du bâtiment
  • Maître d'ouvrage Théâtre Louis Aragon
  • Statut Études en cours
  • Surface 4 350 m2

Installed in a building built in 1985, the Louis Aragon Theater has multiplied its activities until it has been awarded the “Scène conventionnée d’intérêt national, art et création danse” label.
Today, it is cramped within its walls and is planning to restructure and extend its reception areas, administrative and technical premises (offices, workshop, storage), stages, dance floor, studio, meeting rooms. workshop and meeting.